Skip to content

Fence Post Concrete Calculator

Subtract post displacement to estimate concrete volume and bags for every fence post.

Reviewed
2026-09-05
Units
US + metric

Calculated result / live

4 80 lb bags

Order 4 80 lb bags; confirm package yield and supplier increments before purchase.

10% waste. Post displacement is subtracted using actual lumber dimensions.

Input panel

Project measurements

Nominal 4 × 4 is 3.5 in actual; nominal 6 × 6 is 5.5 in.

Secondary quantities
Cubic feet2.311
Cubic yards0.09
80 lb bags4
60 lb bags6

Calculation trace

Formula with your numbers

π × (12.00 in ÷ 24)² × (36.00 in ÷ 12) − (3.50 in² × 36.00 in ÷ 1728) = 2.101 ft³

4 80 lb bags

Preset dimensions

Common project sizes

01

What this fence post concrete calculator calculates

A nominal 4 × 4 post is 3.5 × 3.5 in actual. Subtracting that displacement matters when a 12 in × 36 in hole is filled around the post.

Formula

Hole cylinder volume − actual post volume = concrete volume; multiply by post count and add waste before converting to bags.

Worked example

A 12 in × 36 in hole is 2.356 ft³. A 5.5 in actual 6 × 6 post displaces 0.630 ft³, leaving 1.726 ft³, which rounds to 3 80 lb bags without waste.

Ordering decision

Set post depth and hole diameter from the fence plan. Local frost depth, wind exposure, and soil conditions govern the final hole.

The page cites the applicable Uzi Tools reference table beside the calculator. Product labels, current editions, local code, and a licensed professional govern structural, electrical, and life-safety work.

02

How to use it

  1. Enter the measured dimensions and keep the displayed units beside each field.
  2. Review the concrete for each fence post result and the substituted formula before ordering.
  3. Adjust waste for the layout, cut pattern, product package, and site conditions.
  4. Copy or print the material list, then verify the cited product data and local requirements.
03

Concrete for each fence post

This construction fence-post calculator estimates the concrete around one or more posts and subtracts the space occupied by the actual post. It is deliberately about post holes, not a general slab or aquarium calculation.

04

Limits and professional review

Measurements, product yield, waste, moisture, and site conditions can change the order quantity. Local code and a licensed professional govern structural and electrical work.

05

Data sources

06

Related calculations

07

Same-project tools

08

Questions specific to this estimate