Skip to content

Concrete Footing Calculator

Estimate concrete and reinforcing steel for continuous or isolated rectangular footings.

Reviewed
2026-09-05
Units
US + metric

Calculated result / live

62 80 lb bags

Order 62 80 lb bags; confirm package yield and supplier increments before purchase.

10% waste. Dimensions describe a rectangular project area.

Input panel

Project measurements

Secondary quantities
Cubic feet36.667
Cubic yards1.36
80 lb bags62
60 lb bags82

Calculation trace

Formula with your numbers

10.00 ft × 10.00 ft × (4.00 in ÷ 12) = 33.33 ft³

62 80 lb bags
01

What this concrete footing calculator calculates

A 12 ft × 1.5 ft × 8 in strip footing contains 12 ft³ before waste. The same formula works for an isolated pad when length describes the pad perimeter or count is entered separately.

Formula

Length × width × depth ÷ 12 = cubic feet, then convert 27 ft³ to 1 yd³ and divide by bag yield.

Worked example

For 12 × 1.5 ft at 8 in, 12 × 1.5 × 8 ÷ 12 = 12 ft³. Ten percent waste raises the order to 13.2 ft³, or 0.49 yd³.

Ordering decision

Footing width, depth, bearing, and reinforcement come from soil and structural requirements, not from this quantity estimate.

The page cites the applicable Uzi Tools reference table beside the calculator. Product labels, current editions, local code, and a licensed professional govern structural, electrical, and life-safety work.

02

How to use it

  1. Enter the measured dimensions and keep the displayed units beside each field.
  2. Review the concrete for continuous or isolated footings result and the substituted formula before ordering.
  3. Adjust waste for the layout, cut pattern, product package, and site conditions.
  4. Copy or print the material list, then verify the cited product data and local requirements.
03

Concrete for continuous or isolated footings

Use this footing calculator for a rectangular strip or pad footing. Length, width, depth, and waste produce the concrete quantity; reinforcing steel needs a separate structural detail.

04

Limits and professional review

Measurements, product yield, waste, moisture, and site conditions can change the order quantity. Local code and a licensed professional govern structural and electrical work.

05

Data sources

06

Related calculations

07

Same-project tools

08

Questions specific to this estimate