Concrete Bag Calculator

Convert a concrete volume into 40, 50, 60, or 80 lb bags and 20 or 25 kg bags.

Reviewed
2026-09-05
Units
US + metric

Calculated result / live

62 80 lb bags

Order 62 80 lb bags; confirm package yield and supplier increments before purchase.

10% waste. Dimensions describe a rectangular project area.

Input panel

Project measurements

Secondary quantities
Cubic feet36.667
Cubic yards1.36
80 lb bags62
60 lb bags82

Calculation trace

Formula with your numbers

10.00 ft × 10.00 ft × (4.00 in ÷ 12) = 33.33 ft³

62 80 lb bags
01

What this concrete bag calculator calculates

Bag count depends on the package yield, not the bag weight alone. The cited 80 lb product yield is 0.60 ft³ per bag, so 10 ft³ needs 17 bags before waste.

Formula

Required volume ÷ selected package yield = bags, rounded up to a whole package.

Worked example

A 10 ft³ pour at a 0.60 ft³ 80 lb yield is 16.67 bags, so the order rounds to 17 bags before any waste allowance.

Ordering decision

Compare the 80 lb, 60 lb, and metric rows on the reference table because local products use different yields.

The page cites the applicable Uzi Tools reference table beside the calculator. Product labels, current editions, local code, and a licensed professional govern structural, electrical, and life-safety work.

02

How to use it

  1. Enter the measured dimensions and keep the displayed units beside each field.
  2. Review the convert concrete volume into bags result and the substituted formula before ordering.
  3. Adjust waste for the layout, cut pattern, product package, and site conditions.
  4. Copy or print the material list, then verify the cited product data and local requirements.
03

Convert concrete volume into bags

This concrete bag calculator converts a known volume into 40, 50, 60, and 80 lb US bags plus 20 and 25 kg packages. It answers the ordering question after the slab, footing, or post-hole volume is known.

04

Limits and professional review

Measurements, product yield, waste, moisture, and site conditions can change the order quantity. Local code and a licensed professional govern structural and electrical work.

05

Data sources

06

Related calculations

07

Same-project tools

08

Questions specific to this estimate