Skip to content

Gravel Driveway Calculator

Estimate compacted gravel volume and tons for a driveway by length, width, depth, and layers.

Reviewed
2026-09-05
Units
US + metric

Calculated result / live

2.04 yd³

Order 2.04 yd³ of driveway gravel; the estimate includes 10% waste and weighs about 5,704 lb.

10.00 ft × 10.00 ft area, 6.0 in installed depth, 2800 lb/yd³ (1670 kg/m³), and 10% waste.

Input panel

Project measurements

Secondary quantities
Base volume50.00 ft³
Ordered volume2.04 yd³ / 1.56 m³
Planning weight5,704 lb / 2,587 kg
Density source2800 lb/yd³; 1670 kg/m³

Calculation trace

Formula with your numbers

10.00 ft × 10.00 ft × 6.0 in ÷ 12 = 50.00 ft³; × (1 + 10 ÷ 100) ÷ 27 = 2.04 yd³

2.04 yd³
01

What this gravel driveway calculator calculates

A 20 × 40 ft driveway at 6 in compacted depth contains 400 ft³, or 14.81 yd³, before waste.

Formula

Driveway area × compacted depth = volume; volume × aggregate density = planning weight; add waste before ordering.

Worked example

With 10% waste, 14.81 yd³ becomes 16.30 yd³. At 2,800 lb/yd³, the planning weight is about 22.8 tons, subject to moisture and compaction.

Ordering decision

Order each base layer by the supplier's stated compacted or loose-volume convention. Compaction changes the delivered quantity.

The page cites the applicable Uzi Tools reference table beside the calculator. Product labels, current editions, local code, and a licensed professional govern structural, electrical, and life-safety work.

02

How to use it

  1. Enter the measured dimensions and keep the displayed units beside each field.
  2. Review the gravel for a driveway base result and the substituted formula before ordering.
  3. Adjust waste for the layout, cut pattern, product package, and site conditions.
  4. Copy or print the material list, then verify the cited product data and local requirements.
03

Gravel for a driveway base

Use this driveway gravel calculator for compacted aggregate layers, with length, width, depth, density, and waste. Keep each base layer separate when depths or materials differ.

04

Limits and professional review

Measurements, product yield, waste, moisture, and site conditions can change the order quantity. Local code and a licensed professional govern structural and electrical work.

05

Data sources

06

Related calculations

07

Questions specific to this estimate