Topsoil Calculator

Estimate topsoil volume, weight, and bags from area, depth, density, and waste.

Reviewed
2026-09-05
Units
US + metric

Calculated result / live

0.68 yd³

Order 0.68 yd³ of topsoil; the estimate includes 10% waste and weighs about 1,358 lb.

10.00 ft × 10.00 ft area, 2.0 in installed depth, 2000 lb/yd³ (1190 kg/m³), and 10% waste.

Input panel

Project measurements

Secondary quantities
Base volume16.67 ft³
Ordered volume0.68 yd³ / 0.52 m³
Planning weight1,358 lb / 616 kg
Density source2000 lb/yd³; 1190 kg/m³

Calculation trace

Formula with your numbers

10.00 ft × 10.00 ft × 2.0 in ÷ 12 = 16.67 ft³; × (1 + 10 ÷ 100) ÷ 27 = 0.68 yd³

0.68 yd³
01

What this topsoil calculator calculates

A 500 ft² lawn area at 2 in topsoil depth needs 83.33 ft³, or 3.09 yd³, before waste.

Formula

Area × depth ÷ 12 ÷ 27 = cubic yards; yards × the selected topsoil density = planning weight.

Worked example

With 10% waste, 3.09 yd³ becomes 3.40 yd³. At 2,000 lb/yd³, the planning weight is about 6,800 lb.

Ordering decision

Topsoil depth for sod depends on the existing grade and sod supplier. Confirm whether the delivery is loose volume or screened product.

The page cites the applicable Uzi Tools reference table beside the calculator. Product labels, current editions, local code, and a licensed professional govern structural, electrical, and life-safety work.

02

How to use it

  1. Enter the measured dimensions and keep the displayed units beside each field.
  2. Review the topsoil for beds, grading, or sod result and the substituted formula before ordering.
  3. Adjust waste for the layout, cut pattern, product package, and site conditions.
  4. Copy or print the material list, then verify the cited product data and local requirements.
03

Topsoil for beds, grading, or sod

Use this topsoil calculator for a measured area and installed depth. It reports volume, approximate weight, and package count, with a separate sod-related decision note.

04

Limits and professional review

Measurements, product yield, waste, moisture, and site conditions can change the order quantity. Local code and a licensed professional govern structural and electrical work.