Skip to content

Sand Calculator

Estimate sand cubic yards and weight for a base, fill, or landscaping area.

Reviewed
2026-09-05
Units
US + metric

Calculated result / live

0.34 yd³

Order 0.34 yd³ of sand; the estimate includes 10% waste and weighs about 917 lb.

10.00 ft × 10.00 ft area, 1.0 in installed depth, 2700 lb/yd³ (1610 kg/m³), and 10% waste.

Input panel

Project measurements

Secondary quantities
Base volume8.33 ft³
Ordered volume0.34 yd³ / 0.26 m³
Planning weight917 lb / 416 kg
Density source2700 lb/yd³; 1610 kg/m³

Calculation trace

Formula with your numbers

10.00 ft × 10.00 ft × 1.0 in ÷ 12 = 8.33 ft³; × (1 + 10 ÷ 100) ÷ 27 = 0.34 yd³

0.34 yd³
01

What this sand calculator calculates

A 12 × 12 ft patio at 1 in sand depth contains 12 ft³, or 0.44 yd³, before waste.

Formula

Area × depth ÷ 12 ÷ 27 = cubic yards; cubic yards × sand density = planning weight.

Worked example

Ten percent waste changes 0.44 yd³ to 0.49 yd³. Using 2,700 lb/yd³ gives about 1,320 lb before delivery rules.

Ordering decision

Use the installation specification for bedding depth. Do not treat this page as a sand-and-cement mix design.

The page cites the applicable Uzi Tools reference table beside the calculator. Product labels, current editions, local code, and a licensed professional govern structural, electrical, and life-safety work.

02

How to use it

  1. Enter the measured dimensions and keep the displayed units beside each field.
  2. Review the sand for a base or fill result and the substituted formula before ordering.
  3. Adjust waste for the layout, cut pattern, product package, and site conditions.
  4. Copy or print the material list, then verify the cited product data and local requirements.
03

Sand for a base or fill

This sand calculator estimates volume and approximate weight for bedding, leveling, fill, or landscaping. The layer type matters because sand and cement are separate materials.

04

Limits and professional review

Measurements, product yield, waste, moisture, and site conditions can change the order quantity. Local code and a licensed professional govern structural and electrical work.

05

Data sources

06

Related calculations

07

Same-project tools

08

Questions specific to this estimate